Structural Concrete Works

Structural Concrete Works

Since 1998, Harris Dowd Construction Ltd has been involved in the construction of many of Auckland’s larger-scale commercial concrete structures. The company now operates as Harris Dowd Gibbons Construction Ltd.

In 2003, Harris Dowd was honored with the NZ Concrete Society Award in recognition of outstanding achievement in advancing concrete practice, design, and construction for their work on the Chief Post Office and Britomart Rail Station.

The key features of these works included:

  • Concrete formwork restoration and seismic strengthening
  • 400mm single-sided insitu concrete walls
  • Use of the PERI formwork system, specifically the Trio single-sided climbing system

We own a significant amount of our own formwork and maintain strong relationships with leading suppliers of formwork, propping, shoring, and concrete.

As a leading contractor in pre-cast and insitu structural concrete works, Harris Dowd has successfully completed the structural concrete works for several of Auckland’s most prominent buildings, including:

Some of the clients we’ve worked with

Client Projects

NZICC & Horizon Hotel

Over 30,000m³ of concrete.

Fonterra House & Datacom House
Eden Park Western Concourse

4,000m² structure.

Middlemore Hospital

8 level structure.

Wiri Prison

Concrete works for 3 buildings.

Auckland East Prison

Perimeter fence & tunnel works.

Nugent Street

2 No. x 6 level office building structures.

Smales Farm

25,000m² office building structure.

Scene Apartments

3 No x 16 level concrete structures.

Massey University Library

8 level concrete structure.

Mangere Swimming Pool

5 pool concrete structure.

Sentinel Apartment Building Takapuna

33 level structure.

Victopia Apartments

18 level concrete structure.

Chancery Square

5-11 level mixed use office retail complex.

Parliament Street Apartments

18 level concrete structure.

Anzac Avenue Apartments

16 level concrete structure.

Lumley Tower Office Building

32 level concrete structure.

Central Post Office Redevelopment

Britomart Rail Station.

 

Sugartree Apartments Stage 1 and Stage 2

Insitu concrete and precast placement.

Auckland District Health Board

The New A40 Building: A resilient five-story concrete structure with precast concrete and glass cladding designed for immediate post-disaster operation. Notably, it features bespoke triple friction pendulum bearings enhancing seismic resilience. Deep piled foundations (7.5m to 26m) support the structure, while double-height spaces accommodate chiller, generator halls, and a cooling tower enclosure on the roof level. The building is also designed to accommodate a Health Alliance data center in the future.

ADHB Update: Despite initial delays, progress on up to level 1 is now gaining momentum. The intricate nature of the work has contributed to the gradual pace, but the focus remains on delivering high-quality outcomes. Key features include a 5-story concrete structure with in-situ columns and beams, precast flooring, and complex formwork/falsework designs.